Jim and Tim have moved out of their road side offices and moved to the bottom left hand corner of the depot next to the soon to be opened Stroud Water Canal.
In doing this they also have invested in a full depot refurbishment to include new workshop windows and doors, resurfacing of the depot with concrete and painting of the workshops and outbuilding..